We have foundation walls

It has been a cold week, but the crew has made a lot of progress. They built the foundation wall forms and poured the concrete.

Next week, they will be working as fast as they can to get our sewer line covered again. (We’re putting RV antifreeze into the sewer right now just in case.)

There is a lot to do before they can backfill (put the dirt back in the hole). The concrete forms must be removed. Drain tile needs to be installed. Waterproofing must be installed. There are inspections.

Then, the plumber needs to rough in the underground plumbing for the addition so the slab (and final section of underpinning) can be poured.

Leave a Reply