Orth House II Renovation blog
The addition is nearly complete, aside from a few minor points. The plan is for it to be completely done by the end of next week, at which point phase two will commence!
The momentous change this week is the new hole into our addition.
There are a lot of updates to report on the addition.
We have plumbing fixtures! We have panels! We have (some) trim! We have a tile backsplash! We have light!
Continue reading “Kitchen updates – plumbing, panels, trim, hood, tile, electrical – whew!”
Our builder made a lot of progress preparing for appliance installation, which included installing water and gas valves, electrical circuits, and protecting some floors.
Continue reading “Appliance arrival and installation progress”
Work had been progressing at a good pace.
The street, driveway, and yard were patched and repaired after the water service was upgraded.
This morning, I met with our contractor and electrician to finalize the placement of can lights, switches, and outlets. We had done all of this in detail in the blueprint phase, which was an incredibly helpful process, but there are always a few tweaks.
One of the things I’ve realized is that internal structure (framing, joists, ductwork, etc.) can obstruct ideal placement.